AddendaDiff

Every structural change in the addendum, old and new, before you reprice.

Upload the bid set and the addendum. AddendaDiff pairs the structural sheets, clouds what was redrawn, and lists each changed note, callout and schedule row with its old and new value. Changes the addendum narrative never mentions come first.

On one public school addendum, the narrative described 8 changes. The drawings had 157. See the result

Stage 1 is free for up to 5 comparisons a month. Your first full change list is free, then 1 credit each, $3 to $5 depending on the pack.

From two PDFs to a change list

1

Upload

The bid set and the addendum or reissued sheets, as PDFs. Add the narrative if it is a separate file.

Vector PDFs give values. Scans and photos get the overlay and clouds.

2

Stage 1: where it changed

Sheets matched by number, a red and green overlay per sheet, a ranking of what changed most, a clouded PDF and a check for sheets the addendum names but does not attach.

Free for up to 5 comparisons a month. Usually ready within 10 minutes.

3

Stage 2: what changed

Every changed note, callout, dimension and schedule row, old and new, sorted by whether the narrative describes it. A report PDF, a CSV and a review page with crops.

1 credit per comparison. Usually ready within 40 minutes.

What you can rely on

Built for estimators and project managers at concrete subcontractors who bid from PDFs.